Development
Twelve milestones, published
Every milestone below carries a target date and a status. Progress is counted from deliverables that are actually finished — not set by hand. When a target moves, the old one stays on the page with the reason.
- Current milestone
- M1 — Foundation
- Target
- October 7, 2026
- Deliverables complete
- 44 of 104
- Roadmap version
- v1.1
M1Foundation
IN DEVELOPMENTRepository, development rules, design system, public website foundation.
- Target
- October 7, 2026
Complete
- Monorepo, workspaces and CI
- Development rules, CODEOWNERS and PR governance
- Branch protection on main
- Design tokens as the single source of colour
- Guardrails enforcing product truth in CI
- Release target and countdown governance
- Brand assets: mark, wordmark and horizontal lockup
- Favicon, app icon and social share image
- Product renders mounted into the device frame
- Shared navigation and footer
- Homepage at the specified section order
- Hero running the real Driver Terminal screens
- Hardware presented as an installed system on the truck
- Platform overview
- Driver Terminal page
- Command Center page
- Fleet Gateway page
- Feature explorer with per-feature status
- Public roadmap with revision history
- Development journal
- Founding Fleet page and registration
- Investor page and watchlist registration
- Contact page
- Simulation engine with event contract
- Interactive experience page with role selection
- Virtual clock, event injection, offline and sync
- Skip to next event, and change role
- Fleet scale demonstration from 10 to 1,000 trucks
- Four scenarios, selectable, driven from data
- Load workflow with context-driven document capture
- Truth badges and demo disclaimer
- Privacy, terms, accessibility and security pages
- Sitemap, robots and canonical domain
- Server-side form validation with per-field errors
- Submission storage that reports failure honestly
- Accessibility verified across every route
- Mobile verified at 360, 414 and 768px
- Performance budget met on the homepage
- Security headers on every response
- Accounts, two-factor for administrators, audit log
- Admin portal: registrations, milestones, audit
- Typeface self-hosted, no third-party request on page load
- Database for registrations
- Authentication foundation
In progress
- Hosting and deployment pipeline
Next
- Transactional email
- Admin milestone management
- Website analytics
- Legal review before publication
- Domain connected and TLS live
- Hardware supplier specifications confirmed
M2First working software
PLANNEDAuth, organizations, drivers, trucks, trailers, device registry, two application shells.
- Target
- November 7, 2026
Next
- Authentication and organizations
- Users, roles and permissions
- Drivers, trucks and trailers
- Device registry and assignment
- Driver Terminal shell
- Command Center shell
- Event infrastructure
Gateway on a real truck. Telemetry, GPS, fault codes, local buffering.
- Target
- December 7, 2026
Next
- Gateway integration on the pilot vehicle
- Hardwired gateway to terminal connection
- J1939 telemetry ingestion
- GPS position and heading
- Diagnostic trouble codes
- Local buffering and replay after signal loss
FleetRan running as a secondary operational system on one truck.
- Target
- January 7, 2027
Next
- Kiosk and device-owner mode
- Driver login and truck assignment
- Driver Home with live context
- Truck health from live telemetry
- Daily operation on the founder truck
Load workflow, document capture, maintenance cases.
- Target
- February 7, 2027
Next
- Load lifecycle from assigned to completed
- Context-driven BOL and POD capture
- Document classification and extraction
- Driver issue reporting
- Maintenance case workflow
Live fleet, exception-first operations, alerting.
- Target
- March 7, 2027
Next
- Live fleet map
- Truck, driver and trailer pages
- Load and dispatch views
- Exception-first overview
- Alerting and notification rules
ELD direction selected and started. Not a target we will overstate.
- Target
- April 7, 2027
Next
- Third-party ELD integration evaluated
- HOS engine specification
- Immutable record and audit design reviewed
- Regulatory review by qualified counsel
M8Hardware package
PLANNEDTerminal, gateway, power module, install kit.
- Target
- May 7, 2027
Next
- Terminal supplier confirmed
- Gateway confirmed or custom path chosen
- Power module specification
- Vehicle harnesses and adapters
- Installation kit and verification wizard
M9Founding Fleet beta
PLANNEDFirst external fleet operating on FleetRan.
- Target
- June 7, 2027
Next
- Founding Fleet selected
- Hardware installed on external trucks
- Support and escalation process
- Pilot metrics collected
M10Cameras and trailer
PLANNEDFront camera, event capture, trailer node and pairing.
- Target
- July 7, 2027
Next
- Front camera integration
- Event capture and clip retention
- Live view authorization and audit
- Trailer node and automatic pairing
Driver settlements, location intelligence, AI assistance.
- Target
- August 7, 2027
Next
- Contract and compensation configuration
- Settlement generation and audit trail
- Shipper and receiver intelligence
- AI assistance for driver and owner
M12Commercial release
PLANNEDFleetRan V1.
- Target
- September 7, 2027
Next
- Reliability and recovery targets met
- Onboarding and provisioning at scale
- Commercial terms and support model
- First paying fleets
Revision history
The roadmap is versioned. Entries are added, never removed or rewritten — a plan that only ever shows its latest shape is not a plan anyone can hold us to.
v1.1September 7, 2026
ELD deprioritised. M1 through M6 are unaffected, M7 may slip without moving the release target, and M12 is the point at which compliance stops being optional.
v1.0September 7, 2026
Twelve milestones published, one per month, from Foundation to Commercial Release.